How many weeks of RFP lead time before a building opens?

Metal scaffolding with stairs against a clear blue sky, suggesting a building still under construction.
Photo: Jan van der Wolf / Pexels

If you manage national accounts for a janitorial or facilities services company, you've had this call before: a prospect's property team says a new distribution center or office tower "opens in Q2," and someone upstairs wants to know when to start the RFP clock. Get it wrong and you're either scrambling to staff a site with six weeks' notice, or you've burned a sales cycle chasing a building that won't need a crew until next fiscal year.

There's no single number that fits every building, but most contract administrators and facilities directors plan backward from occupancy using a fairly consistent set of stages.

What eats the lead time

A janitorial RFP isn't just "write proposal, win bid." Between the RFP going out and the first night of service, a handful of things have to happen in sequence:

  • Drafting and issuing the RFP - the facility owner or their broker pulls together scope, square footage, frequency specs, and union requirements. Two to four weeks if someone's driving it hard.
  • Bid walk and Q&A - vendors need to see the building, which usually means it has to be far enough along that walking the floors is safe and useful. Another one to two weeks.
  • Proposal review and vendor selection - for a single site this can move fast. For a multi-site or national account, procurement committees stretch this to four to six weeks.
  • Contract execution - legal review, insurance certs, background check requirements. Easy to lose two more weeks here if nobody's pushing it.
  • Staffing and mobilization - hiring, badging, training on building-specific systems, ordering equipment and the first round of consumables. This is the stage people underestimate most. For a large commercial building, plan on three to six weeks minimum.

Add it up and a straightforward single-building janitorial RFP needs roughly 8 to 12 weeks from issue to first shift. Bundle in day porter services, consumables supply, or a multi-building regional contract, and 12 to 16 weeks is more realistic, especially if the account wants a transition plan and a dry run before the ribbon cutting.

The catch is that this timeline has to land before a specific date on the calendar: the day the building actually opens and starts needing service. And that date almost never matches what the public permit record or the developer's press release says.

Why the permit date is the wrong clock to set your RFP by

Certificate of occupancy filings and news releases tend to lag or lead the real move-in date by weeks, sometimes months. A warehouse can get its CO in March and sit empty until a tenant starts moving racking and inventory in June. An office building can announce a "spring opening" that slides to fall because of a punch list nobody outside the GC sees. If your RFP clock starts on the permit date, you're either pitching four months too early, before the facility manager even has budget authority to sign, or you find out the building's been staffed by a competitor for six weeks because nobody on your team was watching for the real signal: trucks in the lot, racking going up in the yard, cars showing up at shift change.

That's the gap between "a building exists" and "a building needs a janitorial contract." The second one is what starts your real clock, and it shows up as physical activity on site well before any press release or facility director's email confirms it.

This is the exact problem Go-Live Detection was built around: a weekly, dated alert per site that flags the week a finished-but-empty facility starts going live, vehicles in the lot, stock landing in the yard, apron activity starting up, instead of waiting on a permit filing or a cold call to tell you months late.

If you're tracking a pipeline of sites that are built but not yet occupied, working backward from an assumed open date is a guessing game. Working backward from the week the site starts moving gives your team the 8-to-16-week runway it needs to get an RFP out, staffed, and signed before someone else does. If that's the gap costing you accounts, it's worth seeing how the weekly alerts work for the sites on your list.