Blog·

How to price a janitorial bid before you've walked the building

Metal scaffolding with stairs and platforms against a clear blue sky at a construction site.
Photo: Jan van der Wolf / Pexels

An RFP shows up for a distribution center that won't have a finished interior for another four months, or a corporate campus the developer won't let anyone past the fence line on. The bid is due in two weeks. Your estimator wants fixture counts and finish schedules you don't have, and the broker handling the deal isn't calling back.

This comes up often enough on national accounts work that it deserves a real process, built from the records that exist before anyone tours the building.

What you actually need, and what you can fake

A janitorial bid comes down to a handful of inputs: total square footage, the mix of flooring (carpet, VCT, polished concrete, restroom tile), fixture counts per restroom, occupancy pattern (one shift or three), and exterior scope like lot sweeping or a day porter for the dock. Some of these you can estimate from the outside. Some you genuinely cannot, and padding them blind is how you end up either losing the bid on price or winning it and bleeding margin for the life of the contract.

Square footage is the one you can usually get close on without a tour. County assessor and GIS parcel records give you the building footprint, and permit filings (building permit, certificate of occupancy application, sometimes the site plan itself) will often list stories and gross square footage directly. If the permit data is thin, measure the footprint off aerial or satellite imagery and multiply by floor count, which you can usually confirm from the elevation drawings in the planning submittal. For a single-story box, that number is close enough to price from. For a mixed-use building with a parking structure wrapped into the same parcel, read the drawings carefully, because the assessor's gross square footage figure usually includes space you won't be cleaning.

Restroom fixture counts and flooring mix are harder to fake and worth asking for directly. The GC, the property manager, or the leasing agent can usually hand over a finish schedule or a floor plan with fixture counts on it, even pre-occupancy. Ask. Most accounts managers skip this step because the first call goes to voicemail, and that's the difference between a bid built on a real floor plan and one built on a guess.

Pricing the gaps you can't close

Once you've got footprint, floor count, and whatever fixture and finish data you could pull, there's still a gap: occupancy density and traffic pattern, which drives consumable burn and restroom service frequency more than anything else. A warehouse running three shifts with 400 people on the floor needs a different cleaning frequency than the same footprint running a single shift with 60. If the tenant mix isn't public yet, price a mid-range frequency and say so in the proposal, rather than quietly assuming the lighter case to win on price. Property managers reviewing a stack of janitorial bids notice when one vendor's numbers only work if the building stays half-empty, and it tends to cost more credibility than it saves in margin.

The honest version of this bid has a line item or a footnote that says pricing assumes X occupancy density, subject to confirmation at walkthrough. That protects you if the tenant turns out denser than planned, and it reads as competence rather than hedging, because every accounts manager reading the RFP knows the building isn't finished yet either.

The part that actually costs accounts

Getting the bid number right from the outside is the easier half of this problem. The harder half is knowing when the contract starts, because a signed janitorial agreement on a building that's still an empty shell doesn't generate a single billable hour until trucks are in the lot and the floor is occupied. Teams that rely on the general contractor's completion date or a permit timeline routinely start staffing weeks early, or worse, find out a competitor already has crews on site because nobody was watching the building itself. Go-Live Detection was built around that exact gap: a dated, weekly alert from satellite imagery the week a site shows signs of going live, vehicles in the lot, stock in the yard, dock doors moving, so the staffing and consumables order lands on the real date instead of the paper one.

If pricing the bid blind is the first half of this job, knowing when to show up is the second, and that's the part worth watching for automatically.

← Back to the blog