How to read a TI permit for bid timing

Close-up of a metal scaffolding structure with stairs against a clear blue sky at a building under construction.
Photo: Jan van der Wolf / Pexels

A TI permit is public record, free to pull, and it's the first document national accounts teams check when a new site shows up on the lease list. It's also one of the weakest tools for timing a bid: plenty of proposals go out six weeks before the general contractor even mobilizes, because the permit record said the project was live.

Here's what the permit record can and can't tell you, and where the gap usually bites.

What's in the permit record

A tenant improvement permit gives you a handful of hard facts: issue date, declared valuation, square footage, a short scope description, and the contractor of record. Some jurisdictions post plan check status online, which tells you whether the drawings cleared review or are still bouncing back for corrections.

That paperwork trail is a snapshot of city approvals, though, not a jobsite calendar. A permit issue date marks the point the city signed off to start work. The crew shows up whenever the GC lines up subs and materials, and in a lot of markets that gap runs weeks, sometimes a full quarter, especially on a project waiting on steel or HVAC equipment with a long lead time.

Reading the stages like a GC would

Most permit portals show a status progression, and each stage maps to a rough window for bid timing:

Permit issued. Too early. The space could still be an empty shell with no subs scheduled. Sending a proposal now gets you filed and forgotten.

Sub-permits pulled (mechanical, electrical, plumbing, fire). This is the better signal. Once a GC pulls trade permits, they've got subs lined up and a real start date. It's still early for a janitorial or consumables bid, but it's the point to confirm who the property manager or landlord rep is going to be, since that's usually who fields the vendor list later.

Rough inspections passed. Walls are closed up, interior finishes are underway. If the site is a retail box or a distribution facility, this is roughly when racking, fixtures, or shelving start going in. Worth a check-in call, not a full proposal yet.

Final inspection / certificate of occupancy pending. This is the window most national accounts teams aim for. The space is close to done, the owner or operator is starting to think about who runs the floor on day one, and a proposal lands when someone's ready to decide.

The problem is that permit portals often lag the real jobsite by weeks, and a lot of jurisdictions don't update status fields reliably once a permit moves past plan check. You can watch a record sit at "issued" for months after the building is functionally finished, because nobody bothered to close out the paperwork.

Where the permit record runs out

A finaled permit and a CO mark a legal milestone. Plenty of facilities start taking deliveries, running equipment, or stocking shelves before the certificate of occupancy clears, especially in distribution and light industrial where the occupant is also the GC's client and in a hurry to open. On the flip side, a CO can issue and the site can still sit dark for another two months while the tenant finishes fixturing on its own schedule.

That's the gap in the paper trail: it tells you what the city approved, not what's happening on the ground this week. For a national accounts manager juggling a pipeline of sites across multiple metros, checking permit portals one jurisdiction at a time and still guessing at move-in doesn't scale, and it's how competitors sometimes get the account simply because someone drove past the lot and saw trucks.

That's the exact gap Go-Live Detection was built to close: weekly imagery of the site itself, flagging the week vehicles show up in the lot or the yard starts filling, instead of relying on a permit status field that may or may not reflect reality.

If permit portals keep leaving you a few weeks off on when to send the proposal, it's worth seeing what a direct read on the site looks like instead.