A signed facilities contract and an operating facility are two different things, and the gap between them is where a lot of national accounts managers lose track of their own accounts.

The service start date is the day your crew, your supply drop, or your route begins work at a site. The contract signing date is the day someone put a signature on a document. In a clean world those would be close together. In practice, they can be separated by a permit delay, a general contractor running behind, an owner holding occupancy until a tenant mix fills out, or a facilities manager who hasn't even been hired yet to take your call.

Service start date vs. contract signing date

Think of the signing date as the commitment and the service start date as the trigger. A regional grocery chain can sign a floor care agreement in March for a store that doesn't open until September. The contract is real. The scope, the pricing, the SLA, all of it is locked. But nobody shows up to strip and wax a floor that's still covered in construction dust and doesn't have shelving installed yet.

That gap shows up in three places:

  • Billing usually hooks to service start, not signing. Most facilities contracts don't start the meter running until the first service date, so revenue recognition and your sales rep's commission timing both depend on knowing when that date lands, not when the paperwork cleared legal.
  • Staffing and routing get planned off the start date. A janitorial or landscaping crew lead can't hold headcount open for six months on a guess. They need a real week, not a quarter.
  • Consumables orders, dispensers, and route stops get provisioned off it too. Soap, paper, liner stock, and the initial dispenser install all get scheduled against an assumed start. Guess wrong and you're either sitting on inventory or scrambling a last-minute drop.

When does a janitorial contract actually begin

For janitorial, landscaping, pest control, and consumables accounts specifically, "service start" almost never means the day the ink dries. It means the day the building is functionally occupied enough to need the service. A few patterns show up across the industry:

A big-box retailer signs a contract tied to a store opening date that gets set by the real estate and construction teams, not by procurement. That date moves. It moves a lot, usually later, sometimes by months.

A distribution center or fulfillment facility signs with a go-live tied to when racking is installed and the first inbound trucks are scheduled. A janitorial crew or consumables route has nothing to clean or stock in an empty concrete shell, so the effective start sits well after the lease commencement date written into the contract.

A multi-site rollout, where one master agreement covers dozens of locations, has a different start date baked in for every site, and the national accounts manager is the one person expected to track all of them individually.

In every one of these, the contract document tells you the deal exists. It does not tell you the week the site goes live. That's usually tracked through a mix of secondhand channels: a call to the property manager, a note from the GC, a permit-filing alert that's accurate to within a few months at best. None of those catch the physical signal itself, which is a parking lot starting to fill with vehicles, pallets landing in a yard, or an apron starting to show truck and forklift movement.

That's the piece most teams are still guessing at. A weekly check on the physical site, rather than a filing or a phone call, catches the week a facility starts moving, which lands closer to the real service start than anything in the contract file. Go-Live Detection was built around exactly that gap, watching finished-but-empty sites and flagging the week they show signs of going live.

If your pipeline has signed contracts sitting on service dates nobody's confirmed in months, it might be worth seeing what that looks like applied to your own site list.